Our Work
Featured Projects
Our Portfolio
We made an emergency repair to a leaking 66” diameter raw water line providing water to the main water treatment plant serving more than 450,000 people in the City of Wichita.
- Water Treatment Plant
- Waterline
- Emergency Repair
This project was unique and required us to put our problem-solving skills to the test.
- Design Build / Alternative Delivery Methods
- BRIDGE CONSTRUCTION & REHABILITATION
Our two latest projects on the East Kellogg corridor included the biggest contract and the most extensive schedule to date.
- HEAVY HIGHWAY / URBAN EXPRESSWAYS / CITY STREETS
- BRIDGE CONSTRUCTION & REHABILITATION
- MASS EARTHWORK
Cargill is a grain and oilseed plant located here in Wichita, and we have had the opportunity to partner with them since 2016.
- INDUSTRIAL SPECIALTY STRUCTURES
- ALTERNATIVE CONSTRUCTION DELIVERY METHODS
- SITE DEVELOPMENT
This was one of our largest industrial projects to date, lasting a total of 21 months.
- Underground Piping
- Excavation
- Concrete Support Structures
- Special Pipe Racks
In the spring of 2019, unusually excessive rain pushed the Tuttle Lake levels to the second highest ever recorded.
- Bridge Deck Removal
- Bridge Construction
- Substructure Concrete Repair